** Happy "For Real" Birthday to Gigi!! **
**********
Our basement is rolling right along. Walls are up, plumbing in, electric wired and mostly done. Storage shelves built. Tub installed. Trim going up. First coat of paint applied.
This week...the electric will be finished. The tile will be laid. The trim finished. Vanity and toilet installed. The carpet most likely will be laid. Plus I'm sure a few more things that I'm probably forgetting. A week from today our built-ins (bar, bookshelves, desk, etc) get installed. Then some final touches, some cleaning and we're done!!
It's possible in as little as two weeks our basement will be done. It will be completely empty as we have no furniture yet for down there, but it will be done. The toys will be the first thing to move in.
Standing in the toy room/girls' desk area, looking at the bar (on the left), TV area on the right.
**********
Our basement is rolling right along. Walls are up, plumbing in, electric wired and mostly done. Storage shelves built. Tub installed. Trim going up. First coat of paint applied.
This week...the electric will be finished. The tile will be laid. The trim finished. Vanity and toilet installed. The carpet most likely will be laid. Plus I'm sure a few more things that I'm probably forgetting. A week from today our built-ins (bar, bookshelves, desk, etc) get installed. Then some final touches, some cleaning and we're done!!
It's possible in as little as two weeks our basement will be done. It will be completely empty as we have no furniture yet for down there, but it will be done. The toys will be the first thing to move in.
Standing in the toy room/girls' desk area, looking at the bar (on the left), TV area on the right.
Still standing in the toy room, looking into the bathroom on the left (a bit of the bar on the right).

1 comments:
This is life changing! And I feel like it got done in a hurry. (Although I recognize I didn't have to live through the construction.)
I can't wait to stay in the new wing of the Arbaugh Inn soon!
Post a Comment